Application: Mining material transport
Axle: 4 axle, 4x16 tons, FUWA brand
Tire: 315/80R22.5, 16 pcs, KUN LUN brand
Kingpin: 3.5 inch, JOST brand
Brake System: WABCO brand
Support Leg: 28 tons, JOST brand
The load-bearing capacity is completely adequate and the risk of tire blowout is low. This tire is designed for 80-ton heavy-duty trailers. The rated load capacity of a single tire can meet the load-bearing requirements of 16 tons per axle (16 tires evenly distribute the total weight of 80 tons, with each tire bearing only 5 tons, far below the rated load-bearing limit of the tire). Moreover, the wear resistance and impact resistance of Kunlun tires under heavy loads and complex road conditions have been verified by the market, making them suitable for frequent transportation in mining scenarios. As long as regular maintenance is carried out (regularly checking tire pressure and avoiding sharp stones from scratching), the probability of tire blowout is extremely low.

Application: Mining material transport
Axle: 4 axle, 4x16 tons, FUWA brand
Tire: 315/80R22.5, 16 pcs, KUN LUN brand
Kingpin: 3.5 inch, JOST brand
Brake System: WABCO brand
Support Leg: 28 tons, JOST brand
It is stable enough to ensure safe loading and unloading. The 28-ton load-bearing specification of the support leg is designed for heavy-duty scenarios. When the trailer is loading and unloading materials, the support leg will cooperate with the axle to jointly bear the weight of the vehicle body (the center of gravity of the materials is concentrated during loading and unloading, and the support leg mainly bears the weight of the vehicle body and part of the materials). The support legs of the JOST brand are made of high-strength steel, with a stable structure and strong resistance to deformation. They are usually designed with adjustable heights, which can adapt to uneven ground in mining areas, avoiding the risks of vehicle body shaking or overturning during loading and unloading.

Standard delivery is 35-40 days. Customized models may require 45-50 days.
Minimum order for one unit.
Sent us a inquiry on the website or contact us by whatsapp and then we will share you aquotation according to your requirement.